Fllow Us : facebook twitter linkedin youtube
  • info@donmamtc.com
  • 00201117722400
  • IWCF-International Well Control Forum

    Course outline 

    • Formation pressure
    • Normal / Abnormal pressure
    • Hydrostatic effects with different density mud
    •  Primary well control
    •  Leak off test, maximum allowable surface pressure
    • Pump pressure and its relationship with discharge/mud density
    • Equivalent circulating density
    • Causes of reduced hydrostatic head
    •  Early warning signs
    • Positive kick signs while drilling & tripping
    •  Trip margin
    •  Swab and surge effects and associated calculations
    •  Shut in procedures
    • Observation & interpretation of shut in pressure
    •  SIDPP, SICCP, Pit gain
    • SIDPP with NRV in string
    •  Shut in pressures in horizontal wells
    •  ICP, FCP, KMW
    •  Choke line friction
    •  Effect of ROP & permeability on SICP
    •  Hydrocarbon kick behavior in oils based mud
    • Closed and open well migration of gas
    •  Pre kick and kill sheet data
    •  Calculation of influx gradient
    • Classroom exercises, distribution of assignment booklet
    • Simulator
    • Line up procedure before drilling
    • Recording slow circulation rate
    • Recognition of drill brake and corrective measure to be taken
    •  Discussion on assignment
    •  Kick handling methods
    • Step by step procedure for driller and Wait & Weight method
    •  Effect on BHP when surface pressure are not maintained as per schedule during killing
    •  Concurrent method
    •  Volumetric method
    •  Riser margin and subsea stack gas removal
    • Well control in deviated wells
    • Associated calculations
    • Ram type preventer
    • Closing ratio & opening ratio
    •  Annular preventer Rings & Flanges
    •  Stripping operation
    •  Inside BOP’s
    •  Hang off procedure
    •  Diverter system
    • Test plug & cup tester
    •  Testing of BOP stack
    • Function test
    • Pressure test
    • Simulator training
    •  Petection of kick
    •  Well shut in
    •  Recording of shut in pressure
    •  Bringing the pump to kill rate
    •  Well killing by Driller’s method
    •  Discussion on assignments
    •  BOP control unit
    •  Usable fluid calculation
    •  Sizing of accumulator (surface & subsea)
    •  BOP operation from Driller’s/Tool Pusher panel
    •  Trouble shooting of accumulator and surface equipment
    •  Choke and kill manifold
    •  Trip tank
    •  Flow indicator
    •  Mud gas separator
    •  Vacuum degasser
    •  Unusual situations in well control
    • Plugged and washed bit nozzle / choke string washout
    • Lost circulation
    • Total & partial pump failure
    • Kick handling when surface pressure approaches MAASP
    •  Bull heading
    •  Hydrate formation and removal
    • Simulator training
    • Well killing by Weight & Wait method
    •  Unusual situation during well killing
    •  Gas migration
    •  Discussion on assignment & class room exercises on well control principal and procedure
    •  Mock test on IWCF pattern
    •  Post-test discussion
    • Simulator test for batch no. 1,2,3 & 4 and video films on well control related topics
    • Simulator test for batch no 5,6,7, & 8 and video films on well control related topics
    •  Discussions on assignments
    •  Classroom exercise on BOP equipment & control unit
    •  IWCF equipment test
    •  IWCF test principal & procedure test (Drillers 1 ½ hrs & Supervisor 2½ hrs 

     

     

    Code Courses Title Date Venue Price Request
    DR15 IWCF-International Well Control Forum
    27 Jan to 31 Jan 2024 cairo Contact-us
    21 Mar to 25 Mar 2024 Istanbul Contact-us
    12 May to 16 May 2024 KSA -Al-khobar Contact-us
    21 Jul to 25 Jul 2024 cairo Contact-us

    © 2017 Powered by pioneereg.net