Course objective
- Among Contractor, Owner Consultant, Who is responsible for what?
- The Range of Possible Contractual Situations that can arise.
- The Actions required to be taken to Minimize Delay and your Contractual Liability.
- Recommended Contractual Procedures.
- The Documentation to be generated, including that for resolving usual disputes.
- Situations under which you should consult your Legal Advisers.
Who Can Benefit?
- Employees in the management of contracts and procurement
Course outline
- Introduction to FIDIC Form of Contracts
- Rights, Obligations and Responsibilities of each of the parties to the Contract
- Analysis - Recommended Contract Administration Procedures to be followed for each of the Contract Provisions
- Delegation of Authority. Supervision of Works.
- Operation Maintenance Instructions.
- Responsibility for Setting-out accuracy.
- Owner Supplied Materials.
- Lifting equipment, Electricity Water and Gas.
- Program of Works Issues:
- Status of the different programs
- Approval, Rejection
- Methods of Working
- Checking program
- Updating program, Revised program, Acceleration of works, CPM etc..
- Extension of Time for Completion
- Entitlement, Critical path
- Addition and omission to works
- Grouping instructions, Extension of time given
- Timing of extension of time, Acceleration. Expedite works
- Accelerate, Failure to expedite, Progress measurement methods.
- Unforeseen Site Conditions.
- Sub-surface data provided
- Disclaimers, Pre-tender site inspection
- Obligations of the parties
- Make own interpretations"
- Contractor to satisfy himself before tendering.
- Expert interpretations, justified assumptions, Administrative provisions, Tests for As-far-as-practicable Anticipatibility.
- Possession of Site
- Extent of possession of site
- Concurrent occupation
- Safety-OSHA
- Interference
- Foundations.
- Testing and Workmanship
- Contractual requirements
- Investigations to ascertain cause of defect
- Failure to check, Ambiguities
- Reimbursable tests
- Improper rejection
- Commercial waste
- Inspection and testing during manufacture.
- Completion of Works
- Test for Substantial Completion
- Outstanding Works
- Maintenance Certificate
- Risks Transfer on Substantial Completion
- Final Approval of Works
- Unfulfilled Obligations
- Completion of Contract.
- Variation or Change Orders
- Contractual Provisions and its Limitations
- Performance Outside Contract Requirements
- Variation Work to other Contractors
- V.O. to Change Program
- Specialized Work
- Valuation of Variations Claims
- Dispute Resolution, Submission of Details.
- Payment Conditions
- Default by Contractor
- Default of Owner
- Frustration of Contract
- Measurement of Works
- Standard Method of Measurement (SMM)
- Suspension of Works, Suspension for Long Periods, Urgent Repairs or Works.
- Escalation Provisions
- warranty, Guarantee, Bonds Insurance.
- Design Professional and Engineering Contractor Standard FIDIC Contracts.